Archives

Estimating Tips from The DEG

August 19th, 2018 by

Audatex – Frame Replacement Estimate Tips Audatex users having to perform repairs where fluid lines need to be replaced or r/I complete must consider a manual labor time for this operations. Section 4-2 of the DBRM States • Complete R&I of brake line, transmission line, or fuel line is NOT INCLUDED. Section 4-3 Replacement and